Please use this identifier to cite or link to this item: http://dspace.dtu.ac.in:8080/jspui/handle/repository/717
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSHARMA, ALKA-
dc.date.accessioned2011-01-07T09:46:56Z-
dc.date.available2011-01-07T09:46:56Z-
dc.date.issued2008-11-20-
dc.identifier.urihttp://dspace.dtu.ac.in:8080/jspui/handle/repository/717-
dc.descriptionME THESISen_US
dc.description.abstractGlobal Competitiveness today means that the customer is supreme. As the customer .is supreme, only those enterprises are going to be successful which are able to provide goods and services to the customer in timely, cost effective manner and also provide quality, which not only satisfies him but delights him. This study is an insight into the field of organizational continuous improvement. It goes into the details of continuous improvement and attempts to answer the questions – what is continuous improvement?, what are the benefits of it?, and how it is implemented? This study is based on the reduction of production time. This study is done for improving the production time of the considered product Main Wiring Harness. At the same time saving in manpower cost, productivity improvement, capacity increased has been done. The study tries to establish the fact that continuous improvement is a management tool that helps to improve the performance and provides a feedback to the organizati...en_US
dc.language.isoenen_US
dc.relation.ispartofseriesTD-475;108-
dc.subjectGlobal Competitivenessen_US
dc.subjectTwo Wheelersen_US
dc.subjectWiringen_US
dc.titleREDUCTION IN PRODUCTION TIME OF MAIN WIRING HARNESS FOR TWO WHEELERSen_US
Appears in Collections:M.E./M.Tech. Production Engineering

Files in This Item:
File Description SizeFormat 
Page+i+-+xii.doc54 kBMicrosoft WordView/Open
major+project.doc5.22 MBMicrosoft WordView/Open
front+page.doc177.5 kBMicrosoft WordView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.