Please use this identifier to cite or link to this item:
http://dspace.dtu.ac.in:8080/jspui/handle/repository/23527| Title: | POWER DOMAIN AWARE DFT IMPLEMENTATION WITH SCAN CHAINS, IEEE 1500 WRAPPERS, AND LAUNCH-OFF SHIFT FOR DIGITAL DESIGNS TESTABILITY |
| Authors: | KUMAR, PRASHANT Pandey, Neeta (SUPERVISOR) |
| Keywords: | DFT IMPLEMENTATION SCAN CHAINS IEEE 1500 WRAPPERS LAUNCH-OFF SHIFT DIGITAL DESIGNS TESTABILITY |
| Issue Date: | May-2026 |
| Series/Report no.: | TD-9333; |
| Abstract: | Conventional scan-based DFT operates circuits at maximum switching activity during shift, causing test power to exceed functional power by two to three times. This induces IR-drop, thermal stress, and yield loss absent during normal operation. Addressing this requires a unified methodology that maintains high fault coverage while controlling power throughout the test process. This thesis implements a power-aware DFT flow across nine ITC’99 benchmark circuits (b01–b21), covering designs from 5 to 432 flip-flops, using three techniques in combina tion. An IEEE 1801 UPF architecture divides each design into an always-on boundary domain and a switchable core domain, with isolation cells held transparent during ATPG by treating the power-gate control as a test-mode constant. The Integrated Clock Gating (ICG) cells are applied to registers that are written to rarely, gating 320 flip-flops in the dual-processor b21 and 35 flip-flops in the b13 sensor interface, with specific scan-cgc-en ports that preserve complete scan chain access during shift. Structured boundary access is provided by IEEE 1500 core wrapper cells, and at-speed transition coverage is provided on deep ALU and address-adder paths with Launch-Off-Shift (LOS) stages. The flow was done in Cadence Genus 27.10 and confirmed with Cadence Modus 25.10. This work provides an efficient and scalable hardware design flow for power-aware testa bility. It is applicable to complex SoC designs, as well as low-power digital systems, where high fault coverage is needed without exceeding power limits during testing as a key production requirement. |
| URI: | http://dspace.dtu.ac.in:8080/jspui/handle/repository/23527 |
| Appears in Collections: | M.E./M.Tech. Electronics & Communication Engineering |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Prashant Kumar m.tech.pdf | 6.55 MB | Adobe PDF | View/Open | |
| Prashant Kumar plag.pdf | 5.59 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.



