Please use this identifier to cite or link to this item:
http://dspace.dtu.ac.in:8080/jspui/handle/repository/21466
Title: | SCHEDULING WITH COST OPTIMIZATION USING PYTHON PROGRAMMING |
Authors: | NIRALA, RISHABH |
Keywords: | MODERN METHODS PRODUCTION PLANNING GANTT CHART LAKIN SOFTWARE PYTHON PROGRAMMING |
Issue Date: | Jul-2020 |
Series/Report no.: | TD-7811; |
Abstract: | This project deals with modern methods which can be used for planning and scheduling of manufacturing systems. Creating of production plans, using different software products is discussed. Advanced planning and scheduling methods are used for planning and scheduling. The outputs as Gantt charts are presented. Different optimization methods are applied for schedule optimization. Production plan, for every machine is created, after applying the optimization. Scheduling by using Lekin software and by using Python Programming is described. Cost of Scheduling is also optimize using programming model. In this project, Jupyter notebook is used as Python IDE and some packages of libraries are used. |
URI: | http://dspace.dtu.ac.in:8080/jspui/handle/repository/21466 |
Appears in Collections: | M.E./M.Tech. Mechanical Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
RISHABH NIRALA M.Tech.pdf | 1.62 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.