Please use this identifier to cite or link to this item:
http://dspace.dtu.ac.in:8080/jspui/handle/repository/17273
Title: | ROLE OF PROCUREMENT ON FIRM PERFORMANCE IN LARGE EPC PROJECTS |
Authors: | GAIROLA, BIMAL |
Keywords: | PROCUREMENT DEVIATION RECOVERY ENGINEERING PROJECTS EPC INDUSTRY |
Issue Date: | May-2019 |
Series/Report no.: | TD-4811; |
Abstract: | Within engineering, procurement and construction (EPC) companies operating large engineering projects by means of their supply chains, procurement plays a key role in project execution. During project execution, deviations from desired performance in terms of time, cost and quality take place. Procurement can contribute considerably to such deviations as well as to reduce or possibly eliminate them. Based on a comprehensive literature review and the practical experience in the field of Procurement & Supply Chain, the article shows that companies use different ways, namely strategy modifications, process modifications and combined modifications, and implementation of various tools to deal with project deviations. The aim of this study is to understand the role of procurement while dealing with various issues experienced during the execution of deliveries, and the proactive approach applied in order to control the deviations and improve delivery lead time using various tools. |
URI: | http://dspace.dtu.ac.in:8080/jspui/handle/repository/17273 |
Appears in Collections: | MBA |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
First Five Pages_BG_513.pdf | 242.24 kB | Adobe PDF | View/Open | |
Main report_BG_513.pdf | 2.56 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.