Please use this identifier to cite or link to this item: http://dspace.dtu.ac.in:8080/jspui/handle/repository/17029
Title: EFFECTIVENESS OF PERFORMANCE MANAGEMENT SYSTEM AT NUCLEUS SOFTWARE EXPORTS LTD
Authors: MALHOTRA, ANKUSH
Keywords: MANAGEMENT SYSTEM
NUCLEUS SOFTWARE
EXPORTS LTD
Issue Date: May-2015
Series/Report no.: TD2618;
Abstract: The project at Nucleus Software Exports Ltd was focused on Performance Management System. Project was divided into various phases: 1. The first phase mainly concentrated on getting a theoretical knowledge about an ideal Performance Management System. During this tenure, an in depth knowledge about the topic was achieved including its various features, loopholes, contribution to the organization etc. Then, a questionnaire was prepared in order to check the effectiveness of the current system prevailing at Nucleus Software Exports Ltd. 2. In this phase, the online questionnaires were mailed to the employees to extract their views on e-PMS at Nucleus Software Exports Ltd. More than 150 questionnaires were sent out of which only 60 responded. 3. In the subsequent phase of the project, analysis of the data was conducted. It was done by recording the data in an excel sheet and analyzing it was the main part of this phase. 4. The last phase suggested practical recommendations to the organization based on the study and research done on the topic.
URI: http://dspace.dtu.ac.in:8080/jspui/handle/repository/17029
Appears in Collections:MBA

Files in This Item:
File Description SizeFormat 
Effectiveness of Performance Management System.pdf1.14 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.