Please use this identifier to cite or link to this item:
http://dspace.dtu.ac.in:8080/jspui/handle/repository/15512
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | SINGH, DIVYA PRAKASH | - |
dc.date.accessioned | 2017-01-24T09:08:13Z | - |
dc.date.available | 2017-01-24T09:08:13Z | - |
dc.date.issued | 2016-07 | - |
dc.identifier.uri | http://dspace.dtu.ac.in:8080/jspui/handle/repository/15512 | - |
dc.description.abstract | Flexible manufacturing systems (FMS) are famous by the use of data processor control in position of the hard automation mainly found in transfer lines. The high investment need for a FMS and the potential of FMS as a strategic competing apparatus make it attractive to engross in research in this extent. This notes ready a reconsider of literature concerning the operations aspect of FMS. Articles intensive many methodological perspectives are exactly reviewed. The review is done from manifold viewpoints. Future study directions are suggested | en_US |
dc.language.iso | en | en_US |
dc.relation.ispartofseries | TD NO.2647; | - |
dc.subject | FLEXIBLE MANUFACTURING SYSTEM | en_US |
dc.subject | PRODUCTION PLANNING | en_US |
dc.subject | PRODUCTION CONTROL | en_US |
dc.subject | SCHEDULING | en_US |
dc.title | CRITICAL REVIEW ON SCHEDULING OF FLEXIBLE MANUFACTURING SYSTEM | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | M.E./M.Tech. Production Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Divya_Prakash_M.tech_Thesis_2K14_PIE_08.pdf | 1.23 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.